4H Memorial Camp Dining and Kitchen Areas Remodeling04O01N/AN/A10/01/2003
Abbott Power Plant - 3rd RO, Supply, Storage, and Waster Water Treatment Systems ImprovementsU10131N/AN/A07/16/2010
Abbott Power Plant - Gas Boiler ReplacementU12145N/AN/A03/01/2012
Abbott Power Plant - Gas Boiler Replacement - Phase 2U14111N/AN/A06/27/2014
Abbott Power Plant - Intake Cooler - EPC Project #004 U15057N/AN/A07/10/2015
Abbott Power Plant - Utilities Production & Distribution Master PlanU10045N/AN/A01/20/2011
Activities And Recreation Center - Pool Filter Replacement
  • Division 02 - Plumbing Work
U21037BAU21037111/21/2023
Aerodynamics Research Lab AdditionU13017N/AN/A01/08/2013
African American Cultural Center ReplacementU16055N/AN/A06/23/2016
Airport Engineer RetainerU18R19N/AN/A03/30/2017
Airport Planner RetainerU18R20N/AN/A04/07/2017
Allen Hall - Upgrade Electrical System - Phase 2 & 3U22043N/AN/A01/09/2023
Allen Hall - Upgrade Electrical System - Phase 2 & 3
  • Division 01 - General Work
U22043BAU22043111/16/2023
Allerton 4-H Dining Hall RenovationU07040N/AN/A02/19/2007
Allerton Park - New Multi-Use Building
  • Division 01 - General Work
U22016BAU22016112/07/2023
Allerton Park and Retreat Center Master PlanA14001N/AN/A03/21/2014
Altgeld Hall - Electrical Service UpgradeU07130N/AN/A10/04/2007
Altgeld Hall and Illini Hall - Renovation Feasibility Study U10047N/AN/A11/10/2009
Altgeld Hall Renovation and Illini Hall ReplacementU19019N/AN/A12/07/2018
Altgeld Hall Renovation and Illini Hall ReplacementU19019N/AN/A04/11/2019
Animal Feed Processing Facility - Feasibility StudyU07022N/AN/A04/02/2007
Applied Life Studies - Feasibility StudyU06029N/AN/A11/04/2005
Architectural RetainerU18R01N/AN/A01/18/2017
Architectural RetainerU20R01N/AN/A07/26/2019
Architectural RetainerU22R01N/AN/A01/15/2021
Architectural Retainer - RU20R01-RN/AN/A11/01/2019
Architectural Retainer ContractU09R01N/AN/A01/05/2009
Architectural Retainer ContractU13R02N/AN/A03/23/2012
Architectural Retainer FY14U14R04N/AN/A02/28/2013
Architecture Building - Remodeling and Addition Feasibility StudyU14034N/AN/A11/13/2014
Armory - CITL RenovationU14084N/AN/A09/10/2014
Armory - Classroom RepairsU10084N/AN/A04/08/2010
Armory - Limited Renovation of Restrooms, Windows, Doors and FloorsU08052N/AN/A04/23/2008
Armory - Sprinkler InstallationU08059N/AN/A05/05/2008
Armory Arch Stucco & Curtainwall ReplacementU23080N/AN/A05/18/2023
Armory Building - South Exterior Envelope & Floors 1 & 2 Office RemodelingU14110N/AN/A04/14/2015
Armory, Foellinger Auditorium, Huff Hall - Life Safety Deficiency CorrectionsU07058N/AN/A04/02/2007
Art & Design Building - Space Consolidation Feasibility StudyU14055N/AN/A01/23/2014
ART + DESIGN BUILDING AND TURNER HALL SUBSTATION REPLACEMENTS
  • Division 05 - Electrical Work
U23056BAU23056111/17/2023
Asbestos & Lead-Based Paint Abatement Retainer ContractU09R02N/AN/A01/05/2009
Ashton Woods - Replace Parking Lot and Driveways
  • Division 01 - General Work
U22048BAU22048109/28/2023
ASL Basement Remodeling for PGI IGB Interim Facility04C04N/AN/A11/05/2003
Assembly Hall - Renovation and Addition - Master ProjectU11055N/AN/A05/10/2011
Assembly Hall - Structural Investigation and Load RatingU11100N/AN/A07/11/2011
Athletics Maintenance & Operations FacilityU17027N/AN/A01/10/2017
Atkins Tennis Center - Roof Replacement
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U23050BAU23050107/25/2023
Atkins Tennis Center - Roof Replacement
  • Division 01 - General Work
U23050BAU23050107/27/2023
Atkins Tennis Center - Roof Replacement
  • Division 01 - General Work
U23050BAU23050R1109/19/2023
Beckman Institute - Cafe Renovation
  • Division 01 - General Work
U22005BAU22005101/05/2024
Beckman Institute - Cancer Center Basement Lab Renovations
  • Division 02 - Plumbing Work
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U19107BAU19107N/A02/23/2021
Beckman Institute - Cancer Center Basement Lab Renovations
  • Division 01 - General Work
U19107BAU19107N/A02/25/2021
Bevier and Gregory Halls Elevator Improvements0007N/AN/A07/07/2004
Bevier Hall - Elevator ModernizationU09085N/AN/A04/10/2009
Bevier Hall - Infrastructure Renovation - Phase 1U13122N/AN/A06/24/2013
Bevier Hall - Infrastructure Renovation Phase 2U16062N/AN/A10/10/2016
Bevier Hall - Window Replacement
  • Division 01 - General Work
U19032BAU19032N/A10/06/2020
Bielfeldt Athletic Administration Building - Hall of Fame Room RemodelingU13023N/AN/A11/14/2012
Biomass (Miscanthus) CHP and Storage SiloU08098N/AN/A09/18/2008
BSL3 Biocontainment LaboratoryU08097N/AN/A09/10/2008
Burrill Hall - Infrastructure and First Floor RepairsU08075N/AN/A04/25/2008
Burrill Hall - MCB Center for Undergraduate Advising & Instruction U15047N/AN/A03/20/2015
Burrill Hall Electrical UpgradeU06049N/AN/A02/27/2006
Business Instructional Facility - 4th Floor Office AdditionU16102N/AN/A06/15/2016
Business Instructional Facility - Courtyard RenovationsU15048N/AN/A04/20/2015
Business Instructional Facility - Courtyard RenovationsU15048N/AN/A04/20/2015
Campus Chilled Water Conversions - Engineering ServicesU09083N/AN/A03/12/2009
Campus Chilled Water Distribution to Talbot Lab & Grainger LibraryU10034N/AN/A05/03/2011
Campus Chilled Water System Optimization - EPC Project 006U21080N/AN/A01/06/2022
Campus Controls Upgrades for Setback Scheduling (CDB)U10042N/AN/A01/26/2012
Campus Landscape Master PlanU20070N/AN/A08/26/2020
Campus Master Plan Update Urbana ChampaignA15001N/AN/A04/07/2015
Campus Recreation IMPE Phase 2 - LandscapingU08037N/AN/A01/10/2008
Cancer Center Research and Innovation BuildingU21032N/AN/A10/13/2021
Center for Veterans in Higher Education - Design DevelopmentU11098N/AN/A05/03/2011
CERL - Farber Drive Entrance Extension
  • Division 01 - General Work
U19067BAU19067N/A08/24/2021
CERL Main Building AdditionU13024N/AN/A02/06/2013
Champaign Campus Housing Feasibility Study05C15N/AN/A11/23/2004
Champaign Housing Landscape and LightingU07093N/AN/A10/24/2008
Champaign Housing Redevelopment - Phase IU06018N/AN/A09/19/2005
Chemistry Annex - Addition and RenovationU12238N/AN/A10/26/2012
Chilled Water Extension - Lincoln Hall and Newman CenterU07052N/AN/A03/29/2007
Civil Engineer RetainerU14R06N/AN/A04/03/2013
Civil Engineer RetainerU22R04N/AN/A02/26/2021
Civil Engineering Hydrosystems Laboratory - Renovation and ExpansionU15029N/AN/A02/18/2015
Civil Engineering Hydrosystems Laboratory - Renovation and ExpansionU15029N/AN/A04/10/2017
Civil Engineering Hydrosystems Laboratory BP2 - Renovation And Expansion
  • Division 01 - General Work
U15029-2BAU15029-BP2N/A05/29/2020
Civil Engineering RetainerU18R11N/AN/A03/03/2017
Civil Engineering Retainer ContractU09R05N/AN/A01/05/2009
Clark Hall 3rd & 4th Floor Remodel04C15N/AN/A01/12/2004
CLARK, BARTON, AND LUNDGREN HALLS - HEATING PIPING REPLACEMENTU22085-1N/AN/A06/12/2023
College of Engineering Buildings - EPC Project 03U14076N/AN/A04/04/2014
Conference CenterU06013N/AN/A10/07/2005
Cost/Scheduler RetainerU22R06N/AN/A05/04/2021
Crop Sciences - New Research BuildingU11063N/AN/A05/12/2011
Cultural Centers, Ethnic Studies, and Gender/Women Studies BuildingU11065N/AN/A04/11/2011
Davenport Hall - Exterior RepairsU11082N/AN/A04/21/2011
Davenport Hall - Master PlanU12223N/AN/A06/29/2012
Davenport Hall - West RenovationU18012N/AN/A02/27/2018
David Kinley Hall - Classroom RemodelingU09141N/AN/A06/08/2009
David Kinley Hall - Exterior Door and Window Replacement - Phase 2U13115N/AN/A07/15/2013
David Kinley Hall - HVAC and Electrical Remediation U08100N/AN/A06/30/2008
DCL - Main Electrical Service Replacement and Emergency Lighting UpgradeU12137N/AN/A02/23/2012
Design CenterU16015N/AN/A12/02/2015
DIA-Baseball and Softball Training Centers
  • Division 02 - Plumbing Work
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U19046BAU19046N/A08/17/2020
DIA-Baseball and Softball Training Centers
  • Division 01 - General Work
U19046BAU19046N/A08/18/2020
DIA-Baseball and Softball Training Centers
  • Division 02 - Plumbing Work
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U19046BAU19046RN/A11/24/2020
DIA-Baseball and Softball Training Centers
  • Division 01 - General Work
U19046BAU19046RN/A12/04/2020
DIA - Soccer/Track ComplexU18038N/AN/A02/21/2018
DIA - Track and Field ReplacementU18086N/AN/A07/16/2018
Digital Computer Lab 3rd Floor Remodel03N01N/AN/A01/27/2003
Digital Computer Lab CITES Remodel03N12N/AN/A07/14/2004
Digital Computer Laboratory - Life Safety and HVAC UpgradesU18018N/AN/A07/10/2018
Digital Computer Laboratory RemodelU06048N/AN/A02/06/2006
Digital Computing Laboratory - Bioengineering Lab Remodel Phase 2U09031N/AN/A10/08/2008
Digital Computing Laboratory - Bioengineering Lab Remodel Phase 2U13019N/AN/A10/30/2012
Division of Intercollegiate Athletics - Atkins Tennis Center and Eichelberger Field ExpansionU06023N/AN/A10/07/2005
Division of Intercollegiate Athletics - Facility Planning StudyU14015N/AN/A12/16/2013
Doris Kelley Christopher Illinois Extension CenterU21054N/AN/A12/14/2021
Dormitory Life Safety Code 2000 Analysis02U01N/AN/A05/08/2002
Education Building - Exterior Repairs and Ground Floor Room Renovations (CDB)U10038N/AN/A12/20/2010
Education Building HVAC Replacement Phase I & IIU07068N/AN/A06/26/2007
Education Building Phase IV Remodeling05CDB08N/AN/A03/09/2005
Electrical and Computer Engineering FacilityU08032N/AN/A01/18/2008
Elevator Consultant Retainer ContractU08R03N/AN/A03/20/2008
Elevator Consultant Retainer ContractU09R07N/AN/A01/05/2009
Engineering Sciences Building - Exterior Repairs to Roofs and WindowsU10137N/AN/A07/20/2010
Engineering Sciences Building - Iquist Lab Renovation at 1st Floor Tower
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U21011BAU21011N/A08/17/2021
Engineering Sciences Building - Iquist Lab Renovation at 1st Floor Tower
  • Division 01 - General Work
U21011BAU21011N/A08/19/2021
English Building- Slate Roof ReplacementU16002N/AN/A10/23/2015
English Building - Courtyard Roof Replacement and Chilled Water ConnectionU11073N/AN/A04/21/2011
English Building - Interior and Exterior RepairsU08069N/AN/A04/29/2008
Environmental Management ConsultantU14R01N/AN/A04/23/2013
Environmental Management RetainerU18R18N/AN/A03/14/2017
Environmental Services RetainerU22R12N/AN/A02/04/2021
Environmental Services Retainer U24R01N/AN/A08/17/2023
Everitt Lab Electrical Systems Replacement DesignU07082N/AN/A11/15/2007
Everitt Laboratory - 2nd Floor Lab Renovation
  • Division 01 - General Work
U23061BAU23061101/11/2024
Everitt Laboratory Fourth Floor RemodelingU06007N/AN/A08/09/2005
Everitt Laboratory Renovation - Bioengineering Grainger Engineering Breakthroughs InitiativeU14088N/AN/A04/18/2014
Everitt Laboratory Renovation - Bioengineering Grainger Engineering Breakthroughs InitiativeU14088N/AN/A05/01/2014
Everitt Laboratory Renovation - Bioengineering Grainger Engineering Breakthroughs InitiativeU14088N/AN/A07/22/2014
Family Resiliency Building02C08N/AN/A10/11/2002
Family Resiliency Center02C08N/AN/A10/01/2002
FAR Oglesby Traction Elevator ReplacementU08063N/AN/A04/17/2008
FAR Trelease Traction Elevator ReplacementU09097N/AN/A04/07/2009
Feed Mill Demolition
  • Division 01 - General Work
U20038BAU20038N/A06/03/2021
Field Turf Installation at Stadium Terrace and First StreetU07018N/AN/A01/09/2007
Foellinger Auditorium - Balcony Seating RenovationU13043N/AN/A03/22/2013
Foreign Language Building - Exterior Repairs and HVAC Remediation Phase IIU09114N/AN/A06/18/2009
Foreign Language Building - Life Safety and HVAC RemediationU08047N/AN/A03/14/2008
Fred Turner Student Services Building - Roof Replacement
  • Division 01 - General Work
U19086BAU19086N/A05/07/2020
Freer Hall - Pool Infill RenovationU15043N/AN/A02/16/2015
Freer Hall Install Fire Suppression SystemU06001N/AN/A08/01/2005
Freer Hall Third Floor South Gym RemodelU07046N/AN/A02/28/2007
Fruit Research Farm - Relocation - Phase IIU07126N/AN/A07/26/2007
Gregory Drive Reconstruction - Oak Street to First StreetU12089N/AN/A01/12/2012
Gregory Hall - HVAC ReplacementU08051N/AN/A04/18/2008
Gregory Hall - Interior Repair Plan Phase 2U10090N/AN/A04/12/2010
Gregory Hall Life Safety Deficiency CorrectionsU07056N/AN/A03/26/2007
Henry Administration Building - Envelope Repair & HVAC UpgradeU15038N/AN/A01/07/2015
Henry Administration Building - UOFPPU06015N/AN/A10/11/2005
Henry Administration Building Phase IV - OSAC RemodelU07042N/AN/A02/22/2007
Historic Architect RetainerU22R02N/AN/A03/25/2021
Historic Preservation Architect RetainerU14R02N/AN/A04/19/2013
Historic Preservation Architect RetainerU18R10N/AN/A03/07/2017
Historic Preservation Architect Retainer ContractU09R03N/AN/A01/05/2009
Housing - Goodwin and Green Apartments - Window ReplacementU12233N/AN/A05/23/2012
Housing - ISR - Dining Feasibility StudyU12054N/AN/A01/30/2012
Housing - ISR - Food Service Building - Kitchen Ventilation ReplacementU10097N/AN/A04/29/2010
Housing - ISR - Wardall Hall - Elevator ReplacementU12162N/AN/A04/20/2012
Housing - Life Safety Upgrades at Goodwin and Green Street ApartmentsU10080N/AN/A04/23/2010
Housing - Life Safety Upgrades at LAR - Phase IIU10078N/AN/A04/23/2010
Housing - Life Safety Upgrades at Scott Hall U10081N/AN/A04/23/2010
Housing - Life Safety Upgrades at Taft Van Doren U10079N/AN/A04/23/2010
Housing - Life Safety & Finish Upgrades at Hopkins and Weston HallsU11070N/AN/A03/29/2011
Housing - Life Safety, Finish Upgrades, & A/C Installation at Snyder Hall U11069N/AN/A03/29/2011
Housing - Sprinkler & Finish Work Upgrades at Busey/Evans - Phase IU08057N/AN/A04/08/2008
Housing - Sprinkler & Finish Work Upgrades at PAR - Phase IIU08076N/AN/A04/25/2008
Housing Food Stores - Culinary Kitchen Remodel Phase IIU13061N/AN/A03/25/2013
Housing Food Stores Feasibility StudyU13062N/AN/A03/25/2013
Housing Life Safety Code 2000 - Fire Alarm Upgrade and Highrise Sprinkler - Phase VU07005N/AN/A12/01/2006
Housing Life Safety Code 2000 - Fire Alarm Upgrade & ISR Sprinkler - Phase VIU07124N/AN/A08/28/2007
Housing Life Safety Code 2000 - Sherman Piping Valves Replacement Phase II04C47N/AN/A08/20/2004
Housing Life Safety Code 2000 - Sprinkler & Finish Work Upgrades at PAR - Phase IU07125N/AN/A08/28/2007
Housing Life Safety Code 2000 Fire Alarm Upgrade and Highrise Sprinkler04C46N/AN/A08/18/2004
Huff Hall - North AdditionU08048N/AN/A03/10/2008
Huff Hall - Southeast Classroom and Infrastructure RenovationU12252N/AN/A06/20/2012
Huff Hall Gym - Painting Walls & Trusses
  • Division 01 - General Work
U22052BAU22052103/15/2023
Huff Hall Gym - Painting Walls & Trusses
  • Division 01 - General Work
U22052BAU22052R1104/05/2023
I-Dads Assoc Cent Plaza Design Study - Construction
  • Division 01 - General Work
U22009CBAU22009CN/A01/12/2023
IDOT 220 Mph High Speed Rail Preliminary Feasibility StudyU11062N/AN/A03/07/2011
Ikenberry Commons Phase C & D - Residence Hall West and Garner Hall DemolitionU09009N/AN/A10/23/2008
Ikenberry Commons Phase E & G - Residence Hall No. 2 and Forbes Hall DemolitionU09081N/AN/A06/22/2009
Ikenberry Commons #3 Residence Hall with Taft and Van Doren Demo - MasterU12197N/AN/A04/25/2012
Illini Orange Remodel04C16N/AN/A01/09/2004
Illini Union - Exhaust Fan #3 Duct Remediation and Renovation
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 04 - Ventilation and Air Distribution Work
U20084BAU20084N/A02/01/2022
Illini Union - Exhaust Fan #3 Duct Remediation and Renovation
  • Division 01 - General Work
U20084BAU20084N/A02/03/2022
Illini Union - Facility StudyU16058N/AN/A03/24/2016
Illini Union - Infrastructure RepairsU09036N/AN/A02/20/2009
Illini Union - Infrastructure Repairs - Phase 2U10139N/AN/A07/19/2010
Illini Union - Infrastructure Repairs Phase 2 Feasibility StudyU10067N/AN/A02/01/2010
Illini Union - Remodel Illini Rooms A, B, & CU08023N/AN/A11/02/2007
Illini Union - Roof ReplacementU21050N/AN/A02/14/2022
Illini Union - Roof Replacement
  • Division 01 - General Work
U21050BAU21050111/09/2023
Illini Union Levis Center - West Exterior Egress TowerU13060N/AN/A03/20/2013
Illinois Autonomous and Connected Track FacilityU20029N/AN/A10/01/2020
Illinois Field - Baseball Locker Room AdditionU09156N/AN/A07/23/2009
Illinois Field - Baseball Training CenterU19046N/AN/A03/14/2019
Illinois Field - Grandstand Improvements and ExpansionU12258N/AN/A07/16/2012
Illinois Field & Martin Stadium - Parking Lot, Sidewalk and Utility Replacement
  • Division 27 - Site Work
U21034BAU21034N/A06/01/2021
Illinois Fire Service Institute - Burn Site Feasibility StudyU12214N/AN/A05/18/2012
Illinois Fire Service Institute Learning Resource & Research CenterU07087N/AN/A08/28/2007
Illinois Height Modernization Program - Phase 1U09102N/AN/A04/16/2009
Illinois Height Modernization Program - Phase 2 - Master ProjectU10064N/AN/A01/04/2010
Illinois Height Modernization Program - Year 3 - Master ProjectU11038N/AN/A01/04/2011
Illinois Height Modernization Program - Year 4 U12046N/AN/A11/03/2011
Illinois Height Modernization Program - Year 5 - Master ProjectU13008N/AN/A10/25/2012
Illinois Height Modernization RetainerU13R01N/AN/A03/15/2012
Illinois Height Modernization RetainerU14R10N/AN/A04/12/2013
Illinois Height Modernization RetainerU18R16N/AN/A03/17/2017
Illinois Height Modernization RetainerU22R13N/AN/A04/12/2021
ILLINOIS STREET RESIDENCE - TOWNSEND AND WARDALL HALLS RENOVATION U18041N/AN/A02/19/2018
ILLINOIS STREET RESIDENCE - TOWNSEND AND WARDALL HALLS RENOVATION U18041N/AN/A06/07/2018
Illinois Street Residence Dining Facility Renovation & AdditionU12054N/AN/A12/09/2016
Illinois Street Residence Halls - Townsend & Wardall Halls Feasibility StudyU14009N/AN/A09/20/2013
Indoor Golf Facility04S17N/AN/A05/05/2004
Integrated Bioprocessing Research LaboratoryU07063N/AN/A04/04/2007
Irwin Academic Services Center Addition05C41N/AN/A04/29/2005
Japan House Addition - Ogura-Sato AnnexU19002N/AN/A11/09/2020
Japan House Addition - Ogura-Sato Annex
  • Division 01 - General Work
U19002BAU19002111/30/2023
Job Order Contracting FY23
  • Division 01 - General Work
JOC2023BAJOC2023 - Project-Specific Prequalification SubmittalN/A05/13/2022
Job Order Contracting FY23
  • Division 01 - General Work
JOC2023BAJOC2023N/A05/23/2022
Krannert Art Museum - HVAC RemediationU09033N/AN/A10/28/2008
Krannert Art Museum - Kinkead Pavilion Renovation
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
  • Division 06 - Sprinkler Work
U22004BAU22004112/12/2023
Krannert Art Museum - Kinkead Pavilion Renovation
  • Division 01 - General Work
U22004BAU22004112/14/2023
Krannert Art Museum HVAC Repair DesignU08004N/AN/A01/10/2008
Krannert Center For Performing Arts - Accessibility and Elevator UpgradesU19035N/AN/A08/21/2019
Krannert Center For Performing Arts - Accessibility and Elevator Upgrades
  • Division 05 - Electrical Work
U19035BAU19035N/A11/04/2020
Krannert Center For Performing Arts - Accessibility and Elevator Upgrades
  • Division 01 - General Work
U19035BAU19035N/A11/06/2020
Krannert Center For Performing Arts - Accessibility and Elevator Upgrades
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U19035BAU19035BP2N/A02/07/2023
Krannert Center For Performing Arts - Accessibility and Elevator Upgrades
  • Division 01 - General Work
U19035BAU19035BP2N/A02/09/2023
Krannert Center For Performing Arts - Accessibility and Elevator Upgrades
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U19035BAU19035BP2R1BP2 - Rebid03/28/2023
Krannert Center For Performing Arts - Accessibility and Elevator Upgrades
  • Division 01 - General Work
U19035BAU19035BP2R1BP2 - Rebid03/30/2023
Krannert Center For Performing Arts - Accessibility and Elevator Upgrades
  • Division 01 - General Work
U19035BAU19035BP2R2209/12/2023
Krannert Center for Performing Arts - Colwell Playhouse Threatre Stage Floor Replacement
  • Division 01 - General Work
U19052BAU19052N/A11/15/2022
Krannert Center for Performing Arts - Colwell Playhouse Threatre Stage Floor Replacement
  • Division 01 - General Work
U19052BAU19052R1N/A02/16/2023
Krannert Center for Performing Arts - Electrical Upgrades
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 05 - Electrical Work
U21010BAU21010R1106/13/2023
Krannert Center for Performing Arts - Electrical Upgrades
  • Division 01 - General Work
U21010BAU21010R1106/15/2023
Krannert Center for Performing Arts and Krannert Art Museum - Roof Replacements
  • Division 05 - Electrical Work
U21005BAU21005N/A09/27/2022
Krannert Center for Performing Arts and Krannert Art Museum - Roof Replacements
  • Division 01 - General Work
U21005BAU21005N/A09/29/2022
Krannert Center for Performing Arts and Krannert Art Museum - Roof Replacements
  • Division 05 - Electrical Work
U21005BAU21005R1106/20/2023
Krannert Center for Performing Arts and Krannert Art Museum - Roof Replacements
  • Division 01 - General Work
U21005BAU21005R1106/22/2023
Krannert Center for the Performing Arts - Exterior RenovationsU12231N/AN/A06/26/2012
Laboratory Facilities - EPC Project #005U16061N/AN/A03/03/2016
Landscape Architect RetainerU16R02N/AN/A01/04/2016
Landscape Architect RetainerU22R05N/AN/A03/22/2021
Landscape Architect Retainer ContractU08R02N/AN/A03/20/2008
Landscape Architect Retainer ContractU12R01N/AN/A01/12/2011
LAR - Upgrade Kitchen Exhaust & Mechanical SystemsU07006N/AN/A10/20/2006
Law Building - Classroom Revitalization and AdditionU16030N/AN/A03/10/2016
Law Building - Design Concept Feasibility StudyU10036N/AN/A10/08/2009
Library and Undergraduate Library - Life Safety Improvements04S14N/AN/A11/16/2004
Library Remote Storage Phase IIU06069N/AN/A03/27/2006
Library Roof And HVAC Replacement U18014N/AN/A10/12/2022
Lincoln Ave Residence Hall - Fire Suppression System - Phase I U09135N/AN/A06/19/2009
Lincoln Hall04C24N/AN/A02/11/2004
Loomis Laboratory - Instructional Space and Infrastructure RepairsU12163N/AN/A05/14/2012
Loomis Laboratory Ha Lab RemodelingU07003N/AN/A01/09/2007
Main Library - Phase 2 B of the Redevelopment Plan (CDB)U10039N/AN/A01/23/2012
Main Library - Phase 2A of the Redevelopment PlanU10089N/AN/A04/15/2010
Main Library - Rare Book & Manuscript Library - HVAC RemediationU08060N/AN/A04/17/2008
Main Library and Undergraduate Library - Program Assessment and Development PlanU07057N/AN/A04/26/2007
Main Library Feasibility Study05C19N/AN/A12/17/2004
Material Science and Engineering Building First Floor West Wing RemodelU14115N/AN/A06/23/2014
Materials Science and Engineering Building - 212 Suite Laboratory RemodelingU12092N/AN/A02/13/2012
Materials Science and Engineering Building Phase IIA RemodelingU06030N/AN/A11/10/2005
McKinley Health Center - Replace Fan Coil Units - Phase II
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 05 - Electrical Work
U21051BAU21051N/A12/06/2022
McKinley Health Center - Replace Fan Coil Units - Phase II
  • Division 01 - General Work
U21051BAU21051N/A12/08/2022
Mech Engineering Bldg CEMMS Clean Room Lab Remodeling04N05N/AN/A12/09/2003
Mechanical Electrical Engineer RetainerU14R08N/AN/A03/11/2013
Mechanical Electrical RetainerU22R03N/AN/A02/18/2021
Mechanical Engineering Building - Renovation and AdditionU12262N/AN/A08/22/2016
Mechanical Engineering Building - Renovation and Addition - ConceptualizationU12262N/AN/A12/04/2012
Mechanical/ Electrical Engineering Retainer ContractU08R04N/AN/A03/21/2008
Mechanical/ Electrical Engineering Retainer ContractU09R06N/AN/A01/05/2009
Mechanical/Electrical Engineer RetainerU18R05N/AN/A01/05/2017
Mechanical/Electrical Engineering Retainer ContactU12R02N/AN/A01/12/2011
Medical Sciences Bldg. - Renovation of Instructional Labs0005N/AN/A09/01/2004
Medical Sciences Building - Carle Illinois College of Medicine RenovationU17077N/AN/A06/13/2017
Medical Sciences Building - Life Safety UpgradesU13051N/AN/A01/24/2013
Medical Sciences Building - Renovation of Instructional Labs (CDB)U10024N/AN/A01/12/2012
Medical Sciences Building - Ventilation RemediationU08070N/AN/A04/29/2008
Memorial Stadium - First Floor East Joint Expansion Replacement And East Ramp Painting
  • Division 01 - General Work
U23119BAU23119110/17/2023
Memorial Stadium - Masonry Repointing Study U12009N/AN/A09/30/2011
Memorial Stadium - SE Addition & RenovationU17018N/AN/A10/07/2016
Memorial Stadium - SE Addition & RenovationU17018N/AN/A11/03/2016
Memorial Stadium - South and East Facility StudyU14058N/AN/A12/20/2013
Memorial Stadium - South Restroom And Concourse Renovations
  • Division 01 - General Work
U23060BAU23060112/05/2023
Memorial Stadium - Strategic Plan Feasibility Study05S02N/AN/A08/19/2004
Mock Facility Roof Replacement
  • Division 01 - General Work
UXC002BAUXC002N/A04/30/2020
Morrill Hall - Sprinkler & Fire Alarm UpgradesU08061N/AN/A04/28/2008
Morrill Hall AHU ReplacementU07066N/AN/A03/11/2008
Multiple Building - Electrical Upgrades FY20-21
  • Division 05 - Electrical Work
U21003BAU21003N/A09/16/2021
Multiple Building - Emergency Masonry Reconstruction (CDB)U19061N/AN/A08/01/2019
Multiple Building - Fire Alarm Upgrades
  • Division 05 - Electrical Work
U21006BAU21006R1108/01/2023
Multiple Building - Life Safety UpgradesU16028N/AN/A04/05/2016
Multiple Building - Restroom Renovation Phase II U16021N/AN/A10/09/2015
Multiple Building - Roof ReplacementsU16022N/AN/A10/12/2015
Multiple Building Elevator UpgradesU16019N/AN/A01/27/2016
Multiple Building Restroom Renovations U13034N/AN/A01/08/2013
Multiple Building Roof Replacement FY2019U19024N/AN/A03/21/2019
Multiple Building Roof Replacement FY2019
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U19024BAU19024N/A09/22/2020
Multiple Building Roof Replacement FY2019
  • Division 01 - General Work
U19024BAU19024N/A09/24/2020
Mumford Hall Electrical Systems ReplacementU07081N/AN/A10/18/2007
Mumford House RestorationU09112N/AN/A04/28/2009
Music Building - Renovate Instructional Labs0006N/AN/A07/21/2004
Natrual Gas Retainer FY 2008U07R02N/AN/A04/09/2007
Natural Gas Engineer RetainerU14R15N/AN/A04/25/2013
Natural Gas Engineer RetainerU18R15N/AN/A04/18/2017
Natural Gas Engineer RetainerU22R11N/AN/A03/26/2021
Natural Gas Transmission Pipeline Relocation05S06N/AN/A11/23/2004
Natural History Building - Assessment and Development PlanU06083N/AN/A05/19/2006
Natural History Building - ATLAS Computer LabsU08036N/AN/A01/10/2008
Natural History Building - CMU12063N/AN/A11/17/2011
Natural History Building - ConceptualizationU11007N/AN/A09/23/2010
Natural History Building - Structural AnalysisU09080N/AN/A02/25/2009
Natural History Building Conceptualization and Renovation U13NHBAdU13016N/AN/A09/12/2012
NCSA Petascale Computing Facility - Infrastructure Upgrade for Beyond Blue WatersU16097N/AN/A03/31/2016
NCSA Petascale Computing Facility - Infrastructure Upgrade for Beyond Blue WatersU16097N/AN/A06/06/2016
NCSA Track 1 Data Processing CenterU08012N/AN/A09/17/2007
NCSA Track 1 Data Processing Center ConceptualizationU07071N/AN/A05/01/2007
New Residence Hall - Phase I (Architect of Record)U06018-RH-AORN/AN/A09/11/2006
Newmark Civil Engineering Building - Crane Bay InfillU13113N/AN/A06/26/2013
Newmark Civil Engineering Building - Student Center AdditionU08071N/AN/A04/24/2008
North Campus Chiller Plant - Cooling Tower Replacement
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
U21020BAU21020N/A08/10/2021
North Campus Chiller Plant - Cooling Tower Replacement
  • Division 05 - Electrical Work
U21020BAU21020N/A08/10/2021
North Campus Chiller Plant - Cooling Tower Replacement
  • Division 01 - General Work
U21020BAU21020N/A08/12/2021
North Campus Parking Deck - College of Engineering Build OutU12049N/AN/A01/11/2012
North Campus Parking Deck - Install Solar Array - Conceptualization U13038N/AN/A01/09/2013
North Campus Parking Deck - Top Level Fence
  • Division 01 - General Work
U21015BAU21015112/19/2023
North Campus Parking Deck - USGS Addition and Parking RenovationU12251N/AN/A06/25/2012
Noyes Laboratory - Exterior RepairsU10082N/AN/A03/30/2010
Noyes Laboratory - West Classroom RenovationU15001N/AN/A06/05/2015
Noyes Laboratory Biotech Protein Sciences Rms. 311 & 315 - Renovation
  • Division 02 - Plumbing Work
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U20072BAU20072104/04/2023
Noyes Laboratory Biotech Protein Sciences Rms. 311 & 315 - Renovation
  • Division 01 - General Work
U20072BAU20072104/06/2023
Noyes Laboratory Renovation - Nanoscale Theory CenterU13112N/AN/A07/12/2013
Noyes Laboratory Rooms 219 & 250 - RenovationU20119N/AN/A02/24/2022
Noyes Laboratory Rooms 219 & 250 - Renovation
  • Division 02 - Plumbing Work
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U20119BAU20119105/30/2023
Noyes Laboratory Rooms 219 & 250 - Renovation
  • Division 01 - General Work
U20119BAU20119106/01/2023
Noyes Laboratory Rooms 219 & 250 - Renovation
  • Division 01 - General Work
U20119BAU20119R1109/07/2023
Noyes Laboratory, Smith Hall and Stock Pavilion - Roof Replacements
  • Division 01 - General Work
U21024BAU21024N/A03/03/2022
Noyes Laboratory, Smith Hall and Stock Pavilion - Roof Replacements
  • Division 01 - General Work
U21024BAU21024R1N/A02/23/2023
Oak Street Chiller Plant - ESCOU11080N/AN/A06/06/2011
Oak Street Chiller Plant & Distribution SystemU08034N/AN/A01/10/2008
Oglesby Hall - Window Replacement
  • Division 01 - General Work
U20099U20099N/A01/19/2021
Olympic Sports Performance Development & Competition Facility Feasibility StudyU08092N/AN/A06/05/2008
Orchard Downs - Apartment RenovationsU12201N/AN/A04/27/2012
Orchard Downs Community Building - Renovation and Expansion
  • Division 02 - Plumbing Work
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 05 - Electrical Work
U19098BAU19098RN/A04/12/2022
Orchard Downs Community Building - Renovation and Expansion
  • Division 01 - General Work
U19098BAU19098RN/A04/14/2022
Orchard Downs Community Building - Renovation and Expansion
  • Division 02 - Plumbing Work
U19098BAU19098R2N/A04/27/2022
Orchard Downs Community Building - Renovation and Expansion
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
U19098BAU19098R2N/A04/27/2022
Orchard Downs Community Building - Renovation and Expansion
  • Division 05 - Electrical Work
U19098BAU19098R2N/A04/27/2022
Orchard Downs Community Building - Renovation and Expansion
  • Division 01 - General Work
U19098BAU19098R2N/A04/29/2022
PAR BLAISDELL HALL - PHASE 3 REPLACEMENT OF MECHANICAL ROOM SLAB & UTILITIES
  • Division 02 - Plumbing Work
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 05 - Electrical Work
U20098BAU20098N/A08/25/2020
PAR BLAISDELL HALL - PHASE 3 REPLACEMENT OF MECHANICAL ROOM SLAB & UTILITIES
  • Division 01 - General Work
U20098BAU20098N/A08/27/2020
Parking - Central Campus Parking Structure(s)U16113N/AN/A09/14/2016
Parking - Central Campus Parking Structure(s)
  • Division 02 - Plumbing Work
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U16113BAU16113N/A01/12/2021
Parking - Central Campus Parking Structure(s)
  • Division 01 - General Work
U16113BAU16113N/A01/14/2021
Parking - Central Campus Parking Structure(s)
  • Division 02 - Plumbing Work
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U16113BAU16113BP2N/A11/21/2022
Parking - Central Campus Parking Structure(s)
  • Division 01 - General Work
U16113BAU16113BP2N/A11/23/2022
Parking C7 & C10 Rehabilitation03C19N/AN/A01/15/2003
Parking Deck on Surface Parking Lot E14 - Feasibility StudyU07016N/AN/A11/20/2006
Parking Decks C7 and C10 - Masonry RepairsU13101N/AN/A05/17/2013
Parking Lot C3 Improvements 2022
  • Division 01 - General Work
U22015BAU22015N/A04/15/2022
Parking Lot E-14 - Lighting Renovation 2013U13097N/AN/A05/01/2013
Parking Master Plan Update - 2014U14069N/AN/A05/23/2014
Parking Structure Lifecycle Analysis 2009U09157N/AN/A07/30/2009
Pavement Analysis StudyU08002N/AN/A02/07/2008
Penn Ave Res Hall Dining Rooms and Dining Svcs Remodeling04C13N/AN/A01/05/2004
Pennsylvania Avenue Residence Hall - Dining Room and Dining Services RemodelU06076N/AN/A04/03/2006
Pennsylvania Avenue Residence Hall - Window Replacement, Phase II04C48N/AN/A08/16/2004
Pennsylvania Avenue Residence Halls - Restroom Renovation - Phase 1U13144N/AN/A10/16/2013
Pennsylvania Avenue Residence Halls - Restroom Renovations Phase IIU15080N/AN/A06/17/2015
Phase I - Small Project SelectionA20002N/AN/A08/19/2020
Photogrammetry and LiDAR ServicesU20R24N/AN/A01/25/2019
Photogrammetry and LiDAR Services RetainerU14R19N/AN/A09/26/2013
Photogrammetry and LiDAR Services RetainerU16R01N/AN/A07/30/2015
Photogrammetry and LiDAR Services Retainer U24R03N/AN/A08/17/2023
Plant Sciences Laboratory - Roof Replacement
  • Division 05 - Electrical Work
U19115BAU19115N/A05/19/2020
Plant Sciences Laboratory - Roof Replacement
  • Division 01 - General Work
U19115BAU19115N/A05/21/2020
Poultry Research Facility RelocationU06072N/AN/A04/04/2006
Prairie Research Institute Feasibility StudyU15027N/AN/A03/24/2015
Printing Building - Remodeling and Addition for ParkingU12064N/AN/A01/23/2012
PRZM 2.0 Test ProjectU139999N/AN/A02/23/2013
Psychology - Roof ReplacementU12166N/AN/A03/22/2012
Psychology Laboratory - Restroom Renovations
  • Division 02 - Plumbing Work
U20015BAU20015N/A03/02/2021
Psychology Laboratory - Restroom Renovations
  • Division 01 - General Work
U20015BAU20015N/A03/04/2021
Public Safety Building - Feasibility StudyU12186N/AN/A04/09/2012
Qualified Providers Prequalification (Phase I) for Guaranteed Energy Savings Performance ContractsA20002N/AN/A01/30/2020
Rehabilitation Education Center - Infrastructure RepairsU10083N/AN/A03/29/2010
Richmond Studio - Remodel
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
U21033BAU21033N/A02/01/2023
Richmond Studio - Remodel
  • Division 01 - General Work
U21033BAU21033N/A02/03/2023
Roger Adams Laboratory Addition - Center for Applied Molecular Sciences - Feasibility StudyU19097N/AN/A09/02/2020
Roger Adams Laboratory Life Safety and Restroom Upgrades
  • Division 02 - Plumbing Work
  • Division 05 - Electrical Work
  • Division 06 - Sprinkler Work
U18006BAU18006N/A08/24/2022
Roger Adams Laboratory Life Safety and Restroom Upgrades
  • Division 01 - General Work
U18006BAU18006N/A08/26/2022
Roger Adams Laboratory Life Safety and Restroom Upgrades
  • Division 02 - Plumbing Work
  • Division 05 - Electrical Work
  • Division 06 - Sprinkler Work
U18006BAU18006R1N/A01/24/2023
Roger Adams Laboratory Life Safety and Restroom Upgrades
  • Division 01 - General Work
U18006BAU18006R1N/A01/26/2023
School of Labor & Employment Relations - Classroom AdditionU16107N/AN/A08/17/2016
Scott, Snyder, Weston Hall - Limited Remodel at Gregory and Peabody Dr. - Phase IU08056N/AN/A04/17/2008
Sherman Hall - Elevator Replacement - Phase IU13085N/AN/A04/12/2013
Sixth Street and Stadium Reconstruction u12090N/AN/A01/12/2012
Smith Memorial Hall - Infrastructure and Life Safety Phase 2U15091N/AN/A06/25/2015
Smith Memorial Hall - Infrastructure Repairs U11091N/AN/A04/25/2011
Smith Memorial Hall Replace Air Handling Units - Phase IU06002N/AN/A01/04/2007
Social Work Lease Space Build-Out In ECCC Phase IIU07053N/AN/A04/10/2007
South Campus Chilled Water ImprovementsU06010N/AN/A08/18/2005
South Campus Sanitary Sewer ExtensionU06022N/AN/A10/07/2005
South Campus Sanitary Sewer Extension Phase 2AU07140N/AN/A07/26/2007
South Campus Wind TurbineU06019N/AN/A05/12/2006
South Farms-Cable Rigged Camera System for Field Scale Phenotyping
  • Division 05 - Electrical Work
U20127BAU20127N/A09/16/2020
South Farms-Cable Rigged Camera System for Field Scale Phenotyping
  • Division 01 - General Work
U20127BAU20127N/A09/18/2020
Speech & Hearing Clinic - Lab Renovation (CDB)U10043N/AN/A02/25/2015
Steam Tunnel Rehabilitation - Phase 3 - Multiple Locations
  • Division 34 - Utilities Site Work
U21017BAU21017103/09/2023
Structural Engineer RetainerU14R03N/AN/A03/26/2013
Structural Engineer RetainerU18R08N/AN/A01/12/2017
Structural Engineer RetainerU22R08N/AN/A03/01/2021
Structural Engineering Retainer ContractU09R04N/AN/A01/05/2009
Student Dining and Residential Programs BuildingU06018-AORN/AN/A01/31/2006
Student Services Arcade Building - Underpinning East Foundations
  • Division 01 - General Work
U22081BAU22081N/A10/04/2022
Surveying Building RenovationU14072N/AN/A07/10/2014
Swine Research Center ModernizationU21074N/AN/A12/17/2021
Talbot Laboratory - Educational Laboratory Upgrade & ExpansionU15037N/AN/A10/05/2015
The Campus Institute00C501N/AN/A12/28/2000
Trelease Hall - Window Replacement - Phase II
  • Division 01 - General Work
U21055BAU21055N/A11/18/2021
Trelease Hall and FAR Dining Hall - HVAC, Piping, and Exhaust System UpgradesU16114N/AN/A08/25/2016
Turner Hall - Classroom RenovationsU15026N/AN/A03/24/2015
Turner Hall - Exterior Envelope and Energy ReductionU11071N/AN/A01/31/2012
Turner Hall Crop Sciences and Soils Lab RemodelU12184N/AN/A06/08/2012
Ubben Basketball Complex Expansion U20034N/AN/A10/31/2019
Ubben Basketball Complex Expansion U20034N/AN/A02/20/2020
Ubben Basketball Complex Expansion
  • Division 05 - Electrical Work
  • Division 34 - Utilities Site Work
U20034BAU20034BP1N/A02/18/2021
Ubben Basketball Complex Expansion
  • Division 01 - General Work
U20034BAU20034-BP2N/A03/18/2021
Ubben Basketball Complex Expansion
  • Division 01 - General Work
U20034BAU20034BP3N/A05/28/2021
Ubben Basketball Complex Expansion
  • Division 02 - Plumbing Work
U20034BAU20034BP3N/A05/28/2021
Ubben Basketball Complex Expansion
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
U20034BAU20034BP3N/A05/28/2021
Ubben Basketball Complex Expansion
  • Division 04 - Ventilation and Air Distribution Work
  • Division 44 - Other Work
U20034BAU20034BP3N/A05/28/2021
Ubben Basketball Complex Expansion
  • Division 05 - Electrical Work
U20034BAU20034BP3N/A05/28/2021
UIUC and UIS MEP Condition AssessmentU12151N/AN/A02/14/2012
Undergraduate Library RedevelopmentU20118N/AN/A11/12/2020
Undergraduate Library RedevelopmentU20118N/AN/A02/22/2022
Undergraduate Library Redevelopment
  • Division 01 - General Work
  • Division 02 - Plumbing Work
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
  • Division 06 - Sprinkler Work
U20118BAU20118R1107/26/2023
Undergraduate Library Redevelopment U20118-RN/AN/A04/07/2022
University High School - Feasibility StudyU08103N/AN/A07/24/2008
University of Illinois Urbana-Champaign Data Processing Center ConceptualizationU07064N/AN/A05/01/2007
Urbana Champaign Big Broadband - Infrastruction InstallationU11008N/AN/A09/17/2010
Utility Engineer RetainerU14R13N/AN/A04/01/2013
Utility Engineer RetainerU18R13N/AN/A02/16/2017
Utility Engineer RetainerU18R13N/AN/A03/27/2017
Utility Engineer RetainerU18R21N/AN/A08/07/2017
Utility Engineer RetainerU22R10N/AN/A03/23/2021
Utility Engineering Retainer ContractU12R03N/AN/A01/12/2011
Utility Systems Engineering Retainer ContractU08R01N/AN/A03/20/2008
Vet Med Large Animal Clinic - Renovation (CDB)U10033N/AN/A01/23/2012
Veterinary Medicine- Basic Sciences Building - Incinerator Replacement
  • Division 01 - General Work
U20042BAU20042N/A08/26/2021
Veterinary Medicine- Basic Sciences Building - Incinerator Replacement
  • Division 01 - General Work
U20042BAU20042N/A09/09/2021
Veterinary Medicine Feasibility Study04S19N/AN/A04/30/2004
Veterinary Medicine Large Animal Clinic Remodel Wards 3&4 - Feasibility StudyU07044N/AN/A03/14/2007
Veterinary Teaching Hospital - Small Animal Clinic Oncology Center Addition - Design & ConstructionU21076RN/AN/A12/09/2021
Veterinary Teaching Hospital - Small Animal Surgery Renovation & ExpansionU17041N/AN/A06/14/2017
Veterinary Teaching Hospital - Standing Seam Roof ReplacementU14056N/AN/A04/11/2014
Willard Airport - New Traffic Control Tower05O01N/AN/A04/15/2005
Willard Airport - TSA Checkpoint Relocation U22003N/AN/A05/06/2022
Willard Airport Master PlanA06001N/AN/A02/01/2006
Willard Airport Quick Turn Around Rental Car Wash Facility
  • Division 02 - Plumbing Work
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 05 - Electrical Work
U20107BAU20107N/A06/28/2022
Willard Airport Quick Turn Around Rental Car Wash Facility
  • Division 01 - General Work
U20107BAU20107N/A06/30/2022
Willard Airport Quick Turn Around Rental Car Wash Facility
  • Division 02 - Plumbing Work
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 05 - Electrical Work
U20107BAU20107R1N/A11/29/2022
Willard Airport Quick Turn Around Rental Car Wash Facility
  • Division 01 - General Work
U20107BAU20107R1N/A12/01/2022
Wohlers Hall Life Safety Upgrades and Rm 141 RenovationU18007N/AN/A04/03/2019
Wohlers Hall Life Safety Upgrades and Rm 141 Renovation
  • Division 05 - Electrical Work
  • Division 06 - Sprinkler Work
U18007BAU18007N/A11/10/2020
Wohlers Hall Life Safety Upgrades and Rm 141 Renovation
  • Division 01 - General Work
U18007BAU18007N/A11/12/2020
Wright Street Bike Path - Feasibility StudyU08045N/AN/A03/17/2008
Xavier Commons e-Bid Test Project
  • Division 02 - Plumbing Work
  • Division 03 - Heating, Piping, Refrigeration, and Temperature Control Work
  • Division 04 - Ventilation and Air Distribution Work
  • Division 05 - Electrical Work
  • Division 06 - Sprinkler Work
UXC001BAUXC001N/A12/31/2021
Xavier Commons e-Bid Test Project
  • Division 01 - General Work
UXC001BAUXC001N/A12/31/2021
Xavier Commons e-Bid Test ProjectUXC001N/AN/A05/29/2023