Note: The project will be administered using the Owner's web-based project management system. PRZM was developed to maximaize the potential of the Internet in allowing project team members to access and exchange project information. PRZM supports team colllaboration in management and interaction, as well as a team member empowerment on a multi-layer security system. Minimum user requirements are as follows:
- Internet Browser: Microsoft Internet Explorer version 4.0 or higher is recommended.
- E-mail: PRZM requires the user to have a valid e-mail account.
- Computer-Aided Drawing (CAD) viewer.
Only those firms which meet the following qualifications will be considered for selection:
- Licensed to practice as an (Architect, Engineer, or Landscape Architect) in the State of Illinois.
- Prequalified with the State of Illinois Capital Development Board.
- Registered and authorized to do business in the State of Illinois.
- Utilization of AutoCAD compatible System.
The following project-related criteria will be used to evaluate the firms requesting consideration for selection:
- Current commitments of firm, proposed staff and consultants.
- Prior experience of the proposed project staff in the design and construction of similar highrise re-roofing projects.
- Overall design quality of the relevant projects submitted.
- MAFBE participation of Professional Service Consultant and sub-consultants with a goal of 20%. Illinois Department of Central Management Services (CMS) Business Enterprise Program certification is the basis for determination of MAFBE status.
- Prior experience with renovation projects that involve significant structures and sites.
- Firms experience in selecting the appropriate remedial approaches and sound solutions for building envelope projects.
- Expertise and success in construction cost estimating.
- Expertise in scheduling renovation projects in occupied high-rise buildings within congested site areas, including staging, sequencing, and necessary safeguards/protection for students, faculty, and the public.
- Mechanical, Electrical, and Plumbing engineering experience in the disconnection and removal of existing roof top HVAC units, penthouse mounted chillers, condensing units, ventilation units and all associated piping, electrical, and controls.
Firms should submit one electronic copy of their complete submittal response (in pdf format) by 03/22/2012 using the submit button below:
Download an electronic copy of the 255. |