Description of Project: | THIS IS A RATHER COMPREHENSIVE PROJECT TO PROVIDE BETTER ONSITE WATER COLLECTION, TREATMENT, MONITORING AND MEASURING. WATER IN THIS PROJECT INCLUDES STORM WATER AS WELL AS WATER USED IN OR RESULTING FROM PLANT PROCESSES. SEWER SERVICE AND LINE MODIFICATIONS WILL BE MADE TO CAPTURE ALL ONSITE STORM WATER AND PLANT EFFLUENT AND MONITOR AND MEASURE IT BEFORE IT ENTERS THE SANITARY DISTRICT LINES. ADDITIONALLY, THE INSTALLATION OF FOUR(4) LARGE, 120, 000 GALLON STORAGE TANKS WILL PROVIDE THE PLANT WITH AMPLE POLISHING AND MAKEUP WATER CAPACITY AND IMPROVE BOILER WATER FEED QUALITY AND RELIABILITY OF STEAM GENERATOR OPERATIONS. ; SPECIFICALLY, THIS PROJECT WILL INCLUDE: REARRANGEMENT OF CONDENSATE POLISHER VESSELS AND PIPING; ADDITION OF FOUR (4) NEW WATER STORAGE TANKS AND FOUNDATIONS; ADDITION OF AN OWNER-SUPPLIED, CONTAINERIZED RO SYSTEM EQUIPMENT ON A SLAB; ADDITION OF A NEW RAW WATER PUMP IN THE BASEMENT TO SUPPLY THE NEW RO SYSTEM; ADDITION OF A NEW CLARIFIER; EXTENSION OF THE EXISTING COAL CONVEYANCE TUNNEL AND FURTHER MODIFICATIONS TO ACCOMMODATE ROUTING OF ELECTRICAL, CONTROLS, AND PIPING FOR SUPPLY AND RETURN WATER FLOWS TO AND FROM THE RO SYSTEM AND WATER STORAGE TANKS; CONVERSION OF STORM LINES TO SANITARY LINES AND APPROPRIATE RECONFIGURATIONS OF ENTIRE ONSITE SANITARY SEWER SYSTEM; AND THE ADDITION OF A NEW UCSD CONNECTION AT CLARIFIER OUTLET TO MONITOR AND METER. ; THIS PROJECT WILL BE A DESIGN, BID, BUILD PROJECT BEING MANAGED BY A F&S PROJECT MANAGER AND USING THE DESIGN, CONSTRUCTION ADMINISTRATION AND WARRANTY SERVICES OF A FIRM SELECTED THROUGH THE QUALIFICATIONS BASED SELECTION PROCESS. |