Note: The project will be administered using the Owner's web-based project management system. PRZM was developed to maximaize the potential of the Internet in allowing project team members to access and exchange project information. PRZM supports team colllaboration in management and interaction, as well as a team member empowerment on a multi-layer security system. Minimum user requirements are as follows:
- Internet Browser: Microsoft Internet Explorer version 4.0 or higher is recommended.
- E-mail: PRZM requires the user to have a valid e-mail account.
- Computer-Aided Drawing (CAD) viewer.
Only those firms which meet the following qualifications will be considered for selection:
- Licensed to practice as an (Architect, Engineer, or Landscape Architect) in the State of Illinois.
- Prequalified with the State of Illinois Capital Development Board.
- Registered and authorized to do business in the State of Illinois.
- Utilization of AutoCAD compatible System.
The following project-related criteria will be used to evaluate the firms requesting consideration for selection:
- Current commitments of firm, proposed staff and consultants.
- Prior experience of the proposed project staff in the design and construction of similar projects.
- Overall design quality of the relevant projects submitted.
- MAFBE participation of Professional Service Consultant and sub-consultants.
- Documented experience providing emergency and urgent utility repair design support for rapid restoration of services for both utility production and distribution systems.
- Experience interpreting and applying ASME Boiler and Pressure Vessel code for repairs and modifications.
- Experience interpreting and applying NFPA 85 (Boiler Combustion Controls) for coal boilers, gas boiler and heat recovery steam generators for repairs and modifications.
- Experience interpreting and applying NFPA 37 (Stationary Combustion Turbines) for gas and oil fired gas tubine generators repairs and modifications.
- Experience interpreting and applying US DOT Natural Gas Regulations (49 CFR 192) for repairs and modifications to natural gas master meters system and high pressure distribution and transmission lines.
- Experience designing modifications and repairs to the Emerson Delta V Distributed Control Systems (DCS) for power plant controls.
Firms should submit one electronic copy of their complete submittal response (in pdf format) by 03/20/2008 using the submit button below:
Download an electronic copy of the 255. |