Note: The project will be administered using the Owner's web-based project management system. PRZM was developed to maximaize the potential of the Internet in allowing project team members to access and exchange project information. PRZM supports team colllaboration in management and interaction, as well as a team member empowerment on a multi-layer security system. Minimum user requirements are as follows:
- Internet Browser: Microsoft Internet Explorer version 4.0 or higher is recommended.
- E-mail: PRZM requires the user to have a valid e-mail account.
- Computer-Aided Drawing (CAD) viewer.
Only those firms which meet the following qualifications will be considered for selection:
- Licensed to practice as an (Architect, Engineer, or Landscape Architect) in the State of Illinois.
- Prequalified with the State of Illinois Capital Development Board.
- Registered and authorized to do business in the State of Illinois.
- Utilization of AutoCAD compatible System.
The following project-related criteria will be used to evaluate the firms requesting consideration for selection:
- Current commitments of firm, proposed staff and consultants.
- Overall design quality of the relevant projects submitted.
- MAFBE participation of Professional Service Consultant and sub-consultants with a goal of 20%. Illinois Department of Central Management Services (CMS) Business Enterprise Program certification is the basis for determination of MAFBE status.
- Demonstrated specific experience in the services described in the Scope of Work outlined in the attached Technical Contents.
- Proximity of the firm to UIC.
- Staff experience related to the services described in the Scope of Work should be a minimum of 10 years in each specific category:
a. energy supply/electric power generation
b. combined heat and power systems
c. central plant operations
d. district energy systems
e. utility distribution
f. energy management
g. energy efficiency standards
h. power plants serving hospitals
i. high temperature hot water generation
j. central chilled water loops
k. steam production
l. smart grid technology
m. power purchases
n. green power technology
Firms should submit one electronic copy of their complete submittal response (in pdf format) by 06/01/2011 using the submit button below:
Download an electronic copy of the 255. |