Note: The project will be administered using the Owner's web-based project management system. PRZM was developed to maximaize the potential of the Internet in allowing project team members to access and exchange project information. PRZM supports team colllaboration in management and interaction, as well as a team member empowerment on a multi-layer security system. Minimum user requirements are as follows:
- Internet Browser: Microsoft Internet Explorer version 4.0 or higher is recommended.
- E-mail: PRZM requires the user to have a valid e-mail account.
- Computer-Aided Drawing (CAD) viewer.
Only those firms which meet the following qualifications will be considered for selection:
- Licensed to practice as an (Architect, Engineer, or Landscape Architect) in the State of Illinois.
- Prequalified with the State of Illinois Capital Development Board.
- Registered and authorized to do business in the State of Illinois.
- Utilization of AutoCAD compatible System.
The following project-related criteria will be used to evaluate the firms requesting consideration for selection:
- 1. Current commitments of firm, proposed staff and consultants.
-
2. Prior experience of the proposed project staff in the design and construction of similar projects.
-
3. Overall design quality of the relevant projects submitted.
-
4. MAFBE participation of Professional Service Consutltant and sub-consultants with a goal of 20%. Illinois Departmentof Central Management Services(CMS) Business Enterprise Program certification is the basis for determination of MAFBE status.
-
5. Demonstrated excellence of the firm, its assigned staff and consultants with academic learning centers, multi-media classrooms, AV and data systems and acoustical design.
-
6. Overall quality of interior design solutions for comparable projects.
-
7. Experience with application of the LEED program to project design.
-
8. Proven ability to guide participatory planning and development of the project program with a wide range of stakeholders.
-
9. Ability to produce coordinated quality contract documents and methods for implementation.
-
10. Commitment of principal or partner's involvement in project.
-
11. Methods for budget management and cost estimating.
-
12. Demonstrated ability to meet tight project time schedule requirements.
-
13. Quality of presentation and ability to communicate effectively with project team members.
Firms should submit one electronic copy of their complete submittal response (in pdf format) by 04/16/2012 using the submit button below:
Download an electronic copy of the 255. |