Note: The project will be administered using the Owner's web-based project management system. PRZM was developed to maximaize the potential of the Internet in allowing project team members to access and exchange project information. PRZM supports team colllaboration in management and interaction, as well as a team member empowerment on a multi-layer security system. Minimum user requirements are as follows:
- Internet Browser: Microsoft Internet Explorer version 4.0 or higher is recommended.
- E-mail: PRZM requires the user to have a valid e-mail account.
- Computer-Aided Drawing (CAD) viewer.
Only those firms which meet the following qualifications will be considered for selection:
- Licensed to practice as an (Architect, Engineer, or Landscape Architect) in the State of Illinois.
- Prequalified with the State of Illinois Capital Development Board.
- Registered and authorized to do business in the State of Illinois.
- Utilization of AutoCAD compatible System.
The following project-related criteria will be used to evaluate the firms requesting consideration for selection:
- Current commitments of firm, proposed staff and consultants.
- Prior experience of the proposed project staff and team in the design and construction of similar projects: the design and installation of fire suppression systems, and integrated life safety systems into existing and occupied facilities.
- Overall design quality of the relevant projects submitted.
- MAFBE participation of Professional Service Consultant and sub-consultants with a goal of 20%. Illinois Department of Central Management Services (CMS) Business Enterprise Program certification is the basis for determination of MAFBE status.
- Prior experience with projects of similar complexity and magnitude at the university level.
- Prior experience with projects within operational and occupied spaces housing live research animals, medical research resources and environmentally controlled research spaces.
- Expertise and success in construction cost estimating, project scheduling and phasing.
Firms should submit one electronic copy of their complete submittal response (in pdf format) by 01/24/2013 using the submit button below:
Download an electronic copy of the 255. |